![]() The flooding that set in Tuesday knocked out a freezer on the ground floor, threatening the seminary's food supply. Engineer Tim Gerkin and Seminarian Irion St. Romain work just before 1 a.m. Wednesday morning to power up a second-floor freezer. Tim's expression conveys how well the effort was progressing. Next |
| Home
| The Rain | The
Flood | The Repairs | The
Escape | The Rebuilding | Related Links Copyright 2006 Notre Dame Seminary Photographs: Copyright 2005/2006 by Brandon Briscoe All Rights Reserved |